Skip to content

Wet stock

Catching tanker shortages by dip reconciliation

How to check a tanker before and after decanting: settling time, compartment density against the invoice, and dips by chart, so shortages are caught that day.

By PetroKhata team Published 5 min read

On this page
  1. Before the hose goes on
  2. Stop sales from the receiving tank
  3. Let the product settle
  4. Check seals and documents
  5. Compartment density against the invoice
  6. Retention samples
  7. The dip before and the dip after
  8. Why the dip chart matters
  9. A worked example
  10. Shortage against allowance
  11. A checklist for the person on duty
  12. Frequently asked questions

A tanker that arrives a few hundred litres short does not announce itself. The seals look fine, the driver is in a hurry, and the invoice says what it always says. If nobody dips the tank before and after decanting, the shortage disappears into the month's stock variation, where it looks like your loss instead of the supplier's.

Dip reconciliation means comparing what the invoice says with what actually went into your tank, measured by dip and converted with the tank's own calibration chart. It takes about half an hour per delivery done properly, and it is the only way to tell a short delivery from a leaking tank, a faulty nozzle or a stock-keeping mistake.

Before the hose goes on

Stop sales from the receiving tank

Put the receiving tank on hold when the delivery starts. Selling while decanting makes the after-dip meaningless, because you no longer know how much went in and how much went out. PetroKhata puts the tank on hold when a receipt is started and takes it off when the receipt is complete.

Let the product settle

Product in a tanker that has just driven in is moving and has air in it. A density reading or a compartment check on that product will be off. Give it time. PetroKhata starts a 10-minute settling timer when the receipt begins, and the next step stays locked until it runs out. Use those minutes for the paperwork below. If your oil company expects a longer wait, follow that.

Check seals and documents

Check that every seal is intact and that the seal numbers match the invoice. Look at the tanker's calibration certificate. Check the compartments for water. For petrol, do the filter paper test your OMC prescribes. Write down who checked and at what time. In PetroKhata these are ticked on the receipt, and decanting stays locked until they are, so the record shows the checks came first and were not filled in afterwards.

Compartment density against the invoice

The invoice states the density of the product loaded. Take a sample from each compartment, read the observed density with the hydrometer and the temperature with the thermometer, and correct it to 15 °C using ASTM Table 53B, the standard correction table kept at the station. Then compare the corrected figure with the invoice.

The limit widely applied, and the one PetroKhata uses, is plus or minus 3.0 kg/m³ from the invoice density. A compartment outside that should not be decanted. PetroKhata stops the receipt at that step and records the delivery as rejected. Confirm the current limit and the reporting procedure with your sales officer, since that is who you will be reporting to.

A note on accuracy: PetroKhata's density correction has been tested for behaviour but not yet checked row by row against a printed Table 53B. Until it has been, compare a few corrected values with your printed table.

Retention samples

Fill and seal retention samples as your OMC requires, and write down the seal or label numbers and the driver's name. If a quality complaint comes later, these samples are your evidence. PetroKhata logs the sample numbers with the delivery.

The dip before and the dip after

This is the core of the reconciliation.

  1. Dip before. Before decanting, take the product dip and the water dip of the receiving tank. Convert the product dip to litres with that tank's calibration chart, not a chart from a similar tank.
  2. Decant. Note the start and end time.
  3. Dip after. Once the product in the tank has settled, take the product dip and water dip again and convert to litres.
  4. Compare. Litres received by dip are the after-dip litres minus the before-dip litres. Compare that with the invoice quantity. The difference is the shortage, or excess, for this delivery.

Why the dip chart matters

A dip reading is in millimetres; the invoice is in litres. The calibration chart is what joins them, and tanks are not perfect cylinders. Near the bottom and top of a horizontal tank, a few millimetres can mean many litres. Using an approximate chart, or one copied from another tank, can create a shortage that does not exist or hide one that does.

In PetroKhata you paste each tank's chart from Excel or open it from a CSV during setup. It is checked as you paste: rows counted, the range read back, and anything that does not rise steadily to the tank's capacity pointed out before it is saved. After that, every dip in millimetres becomes litres from that chart, the same way every time.

A worked example

Step Reading Litres by chart
Dip before decanting 1,102 mm 8,240 L
Dip after decanting 1,846 mm 20,115 L
Received by dip 11,875 L
Invoice quantity 12,000 L
Shortage by dip 125 L

The figures are illustrative; your tank's chart gives the litres. A 125-litre gap on one delivery might be within what your OMC allows. The same gap on every delivery from the same truck is a pattern worth raising.

Shortage against allowance

No measurement is exact. Temperature changes volume, dip rods are read by eye, and oil companies allow for some loss in transit and handling. The allowance, and how a claim is made, depends on your company and your agreement, so get the figure from your sales officer rather than from a WhatsApp forward.

What you control is the record. When every delivery has a before-dip, an after-dip and a shortage written against it, three things become possible:

  • You can show the sales officer the pattern, delivery by delivery, rather than arguing from memory.
  • Your monthly stock variation stops absorbing supplier shortages, so a real loss at the station (a leak, a meter drifting, theft) stands out.
  • Your accountant can see invoice litres and received litres side by side when entering the purchase.

PetroKhata records the shortage or excess on each delivery, adds the litres received into book stock, and on the PC used for accounts shows invoice and dip litres side by side on the fuel bill. After decanting it also asks for a reference density for the tank, so the next morning's density has something to be compared with.

A checklist for the person on duty

  • Receiving tank on hold
  • Settling time allowed
  • Seals checked and numbers matched to the invoice
  • Calibration certificate seen
  • Water check on the compartments, filter paper test for petrol
  • Compartment density at 15 °C within the limit of the invoice
  • Retention samples sealed and numbered
  • Product and water dip before
  • Decant, with start and end time
  • Product and water dip after
  • Shortage or excess written down, signed by the person who dipped

You can see the tanker receipt screen from a demo station on the screens page, including the compartment densities and the dips before and after. If short deliveries are a regular argument at your station, talk to us about running PetroKhata as a pilot. We will start by setting up your tank charts with you.

Frequently asked questions

How long should the product settle before dipping?

PetroKhata runs a 10-minute settling timer after the tanker arrives that cannot be skipped, because a dip or density taken on moving product is not reliable. Your oil company may expect a different waiting time, before or after decanting, so confirm it with your sales officer.

What if a compartment's density does not match the invoice?

PetroKhata rejects the delivery when a compartment's density at 15 °C is more than 3.0 kg/m³ away from the invoice figure, so it cannot be decanted. Do not unload it; inform the supply location and your sales officer, and follow their instructions.

Is every shortage by dip a real loss?

Not always. Dip readings, temperature and the tank chart all have some uncertainty, and oil companies allow for some transit and handling loss. What matters is recording the figure every time, so a pattern shows up. Ask your sales officer what allowance applies and how to raise a claim.

  • Compliance

    MDG 2024 inspection checklist for dealers

    What to keep ready before an oil company officer inspects your petrol pump under MDG 2024: morning density, dips, stock registers and 5-litre measure checks.

    6 min read

  • Shift close

    Shift closing without errors or rollovers

    How to close a petrol pump shift step by step: totalizer readings, meter rollover, test litres, cash by denomination, card and QR batch totals, corrections.

    5 min read

  • Accounts

    Exporting sales and GST to Tally Prime offline

    How a fuel station can send daily sales, purchases and GST to Tally Prime without retyping, with petrol and diesel outside GST and lubricants under it.

    5 min read